Wednesday, September 28, 2016

SSPA Power Supply - Fixes Post Load Test #5


Here are the 'fixes' (or changes) post Load Test #5.  I've added a 200A final contactor so that I can use the voltage monitors to control if we allow power output from the power supply based on voltage being in the proper range.  I can also now delay allowing voltage output until all the supplies have stabilized on initial startup.

I've also added fans and heat sinks for the final dual diodes.

Here's a short video demo of the smoke-test after these changes were made.


And now on to the full load test #6 next.


No comments:

Post a Comment